Work Implemented by the Engineering Department

Maintenance:

• Maintenance of all government schools within the city.
• Repairing dumpsters in several locations.
• Expanding the network of outdoor lighting in several locations in the city, in addition to regular maintenance of existing network.
• Building several retaining walls in the city.
• Building stone walls in several locations in the city.
• Rehabilitating the slaughter house entrance and the front area.
• Establish a Park and tents for the scouts at Osh Ghorab site.
• The extension of sewer lines at several locations in the city about 2 km in length.
• Work on the extension of power lines in the Osh Ghorab’s Area.
• Supervise and maintenance of all parks in the city.
• Build picnic tables for the camp site.
• Put up rough and soft Plaster for the storage room at the slaughterhouse.
• Build a gate for the storage room in the Slaughter house.
• The installation of traffic signals at several sites in the city.
• Cleaning dirt and grass in several locations in the city.
• Build a trench for rainwater.
• Putting up electrical poles in several locations.
• Building stone walls on the border of streets in several locations in the city.
• Putting fences around Osh Grab Area.
• The extension of power lines in the Osh Ghorab Area.
• The expansion of several streets in the city.

Electricity:

1. Programming the lighting hours for the street lighting fixtures.
2. Replacing broken Street lighting fixtures.
3. Work estimates for the extension of new lighting at several locations in the city.
4. Installation of a fingerprint time clock for the staff at the municipality to calculate their working hours.
9. Repair ABC cables in several locations in the city.
10. Welding traffic signs in addition to electrical poles.